Assigning Movements to Static Route

Users can add movements to static routes in the Logistics Planner Workbench and view the impact of the changes as part of a "what if" scenario.


Complete the following steps to assign movements to static routes.

  1. Log in to the ONE network.

  2. Click Menus/Favs > Transportation > Planner Workbench.
    The Planner Workbench screen displays.

    images/download/attachments/131833006/2023-04-14_10-47-06-version-1-modificationdate-1681490870000-api-v2.png



  3. Complete the following fields to populate the subnet for the planner workbench. Fields with an asterisk ( * ) are required.

    1. Use the calendar tool to fill in the * Delivery Range dates.

    2. Use the picker tool to select the sites for the Depots field.

    3. Type in the value for the Shipment Number field. Asterisks ( * ) as wild cards are permitted.

    4. If more filters are required for the search parameters, click the dropdown arrow to Add a field...
      The new field displays.

    5. Select a value for the new field.

  4. Click the Apply button.
    The screen refreshes with a map in the background, a list of shipments, and a popup window for NEO Prescriptions.

    images/download/attachments/131833006/image2020-7-29_16-11-55-version-1-modificationdate-1681491244000-api-v2.png




  5. There are two ways to access the Assign to Static Route slide out.

    • Using the Map View images/download/attachments/131833006/image2020-7-29_16-46-6-version-1-modificationdate-1681490563000-api-v2.png :

      1. If the movement list is not displayed, click the movement list button in the upper left corner.

        images/download/attachments/131833006/image2020-7-29_16-47-58-version-1-modificationdate-1681490563000-api-v2.png
      2. Click the crossed arrow icon for a movement in the movement list to add it to the map view.
        The crossed arrow icon turns blue, and the movement is added to the map.

        images/download/attachments/131833006/image2020-7-29_16-30-46-version-1-modificationdate-1681491802000-api-v2.png




      3. Click a circle icon (a stop) to display the stop popup, or click the colored bar (a route) to display the movement popup.

        images/download/attachments/131833006/image2020-7-29_16-36-56-version-1-modificationdate-1681490563000-api-v2.png

        images/download/attachments/131833006/image2020-7-29_16-37-33-version-1-modificationdate-1681490563000-api-v2.png



      4. Click the Actions icon.
        A menu displays.

      5. Click Assign to Static Route.
        The Assign to Static Route slide-out displays.

    • Using the Grid View:

      1. Click the Grid View icon on the right side of the screen.

        images/download/attachments/131833006/image2020-7-29_16-44-56-version-1-modificationdate-1681490563000-api-v2.png


        The Grid View screen displays.



      2. If the movement list is not displayed, click the movement list button in the upper left corner.
        The movement list displays.

      3. Click the crossed arrow icon for a movement.
        The movement is added to the table in the grid view.

      4. Click the movement list button to close the list.

        images/download/attachments/131833006/image2020-7-29_16-44-15-version-1-modificationdate-1681491866000-api-v2.png



      5. Click the Actions button next to the movement name.

        images/download/attachments/131833006/image2020-8-6_16-4-23-version-1-modificationdate-1681490563000-api-v2.png


        A menu of actions displays.

      6. Click Assign to Static Route.
        The Assign to Static Route slide-out displays.

        images/download/attachments/131833006/image2020-8-6_16-20-24-version-1-modificationdate-1681490563000-api-v2.png



  6. Select a static route from the list.

  7. Click the Add to Scratchpad button.
    The screen refreshes, and the task is added to the Scratchpad Tasklist.

  8. At this point, users have a number of options to move forward with the movement.

    1. Click the Execute button (

      images/download/attachments/131833006/image2020-8-6_11-54-21-version-1-modificationdate-1681490563000-api-v2.png

      ) to execute the changes.

    2. Click the Compare to Baseline button (

      images/download/attachments/131833006/image2020-8-6_11-53-42-version-1-modificationdate-1681490563000-api-v2.png

      ) to view utilization details from before and after the assignment was made.